Rough in half bath
Rough in water lines
Rough in waste lines
Repair fixtures as needed
Finish half bath
Finish water lines
Finish waste lines
Install fixtures
Bid requirements:
-Scheduled visit to job site
-Written or emailed line item estimate
-Night or weekends
-50/50 Draws with NO deposit
-General liability and work-mans comp insurance, or the willingness to acquire it.