QR Code Link to This Post Dump Trailers, Owner Operators, Grapple Trucks needed for Puerto Rico Disaster Relief. Equipment will be shipped out on December 14, 16, 18 or 22nd depending on filling barge schedules. Crews will leave 3 to 5 days after. All owner operators/drivers are responsible for getting their equipment to the barge staging area in Miami. Work load is anticipated at 3 months to 1 year +/- could be extended.